
BEFORE — Original pool condition before new plaster, waterline tile, equipment and solar heating.

DURING — Old tile removed and the pool surface prepared for new plaster and waterline tile.

AFTER — New plaster and waterline tile, with the pool refilled.

AFTER — New pump, filter and solar controls, with updated equipment plumbing.

BEFORE — Existing pump and filter before the equipment upgrade.

SOLAR HEATING — New supply and return plumbing with isolation valves leading to the rooftop solar system.

BEFORE — The drained pool shows its existing interior finish and tile before renovation.

DURING — Forms, gravel base and reinforcing steel prepared for the new concrete around the pool.

AFTER — The remodeled pool, refilled and ready to enjoy, with a refreshed interior finish, tile and updated poolside concrete.
Sacramento Dolphin Pools
California Contractor License #1026560 | BBB Accredited Business • A+ Rating
CALL TODAY (916) 640-4164